Aero Logistics at Steel River industrial estate included two buildings, including a heavy duty mezzanine in the aircraft and helicopter hanger.
1600m² warehouse and two storey office facility, totaling to a floor area of 2051 m².
1600m² warehouse and two storey office facility, totaling to a floor area of 2051 m².
Impact Mining
Mining Equipment
Mayfield West
Precast Panels
Contact our specialised team for more information about our products and how we can meet your specifications.
Aero Logistics at Steel River industrial estate included two buildings, including a heavy duty mezzanine in the aircraft and helicopter hanger.
Four industrial units, truss and column fabrication, all with plus crane beams, mezzanines and offices.