The large footprint meant a large span for the the structural steel roof and columns, designed and fabricated by Hunter Structural Steel. 23 tonnes of steel were used in the roof structure alone.
Electrodry
- Large span beams
Shaping the future, one project at a time.
Recently, we have undertaken several high-profile projects that have showcased our expertise and commitment to quality.
The large footprint meant a large span for the the structural steel roof and columns, designed and fabricated by Hunter Structural Steel. 23 tonnes of steel were used in the roof structure alone.
Four industrial units, truss and column fabrication, all with plus crane beams, mezzanines and offices.
Working with GWH and the wider Hunter Construction Group, the new Wyee Shopping Village was completed in September 2021 and covers over 5,000 square metres.
Lawson Street in Hamilton was a refurb of an existing commercial office building. An updated staircase as well as stylish trusses on the top floor were part of the makeover.
Consisting of 2 Stages, this project by GWH and was completed in early 2024.
A fresh new development on the Pacific Highway in Belmont is this commercial centre boasting a Metro Service Station, Guzman Y Gomez restaurant, and Subway store.
Aero Logistics at Steel River industrial estate included two buildings, including a heavy duty mezzanine in the aircraft and helicopter hanger.
As part of an environmental initiative, structural steel and precast panels were used to create a dust mitigation and sound reduction barrier for Hunter Quarries’ new rock crusher.
Consisting of 2 buildings, Ellsmere Ave industrial units cover a total of 1008 square metres. It consists of 10 industrial units ranging from 70 to 140 sqm. Constructed using a structural steel frame and full height precast concrete panels, the high clearance warehouse/workshop areas include automated garage doors and mezzanines with stairs.
A-Grade office & retail space in prime Newcastle CBD location. Construction commenced August 2020, and completion early 2022.
Situated opposite the Salamander Square Shopping Centre, this bulky goods/commercial development consists of four strata title units.
Two sets of industrial unit complexes located within the Shearwater Business Park at Taylors Beach. Each development contains 13 industrial units spanning in size from 121m2 – 160m2.
Impact Mining Equipment constructed their new warehouse and office facility, relocating from their original premise. Hunter Precast worked with GWH and Hunter Structural Steel to erect the structure within the tight build window.
Truly a reimagining of the industrial unit. Overlooking the south channel of the Hunter River is the latest Cubby Hole industrial micro unit development.