Impact Mining Equipment

1600m² warehouse and two storey office facility, totaling to a floor area of 2051 m².

Summary
  • Client

    Impact Mining

  • Sector

    Mining Equipment

  • Location

    Mayfield West

  • Products

    Precast Panels

Scope

Impact Mining Equipment constructed their new warehouse and office facility, relocating from their original premise. Hunter Precast worked with GWH and Hunter Structural Steel to erect the structure within the tight build window.

Details

  • 113 precast elements
  • 7,786m2 @ 100mm

Products

  • Wall Panels

Partner with us on your next project

Contact our specialised team for more information about our products and how we can meet your specifications.

Our Projects

Electrodry

The large footprint meant a large span for the the structural steel roof and columns, designed and fabricated by Hunter Structural Steel. 23 tonnes of steel were used in the roof structure alone.

19 and 21 Shearwater Drive

Two sets of industrial unit complexes located within the Shearwater Business Park at Taylors Beach. Each development contains 13 industrial units spanning in size from 121m2 – 160m2.

Menu